Grain Handling Complex

111111

In the international arena Ukraine is a country with great agricultural potential (the state is among the ten grain exporters in the world with the potential grain exports more than 60 million. Tons), the disposal of which the quality of land, proximity to water resources and hardworking population.

But for the successful development of export potential need for a qualitative development of modern port infrastructure, including the construction of port grain terminals. It is planned to build a modern, high-tech handling system, which is unparalleled in the region, as the norm of one-time storage, as well as on the planned annual turnover.

Capacity of the terminal will be 1 mln. Tons of grain per year. Including food – 600 thousand. Tons per year. According to the draft, the terminal includes a discharge station wagons – hopper capacity – 200 tons per hour and the power car unloading station -250 tonn.na hour, with temperature control, drying and weighing of the load at all stages. The design capacity of the grain terminal, designed for 32 thousand. Tons of storage of grain, will be one of the most modern on the Azov Sea.